  1. What she was that she does not see any future with me, because i haven't mention anything about marriage plans. It pains me that something trivial as not even mentioning anything about would become a cause for a breakup, to think we're more than a year now :( just happened yesterday and im still in a daze on what happened

  2. Hello everyone!! just had a long break, & had setbacks on the side. Anyway, in case everyone hasnt heard of it yet

    DPWH has issued a circular making it mandatory that all building permits must have a supplement on construction safety.

    Which in effect would mean besides your specifications writer, you need to have a safety practitioner ( the licensed type ) to make you a safety program, as attachment to your application for bldg. permit.

     

    I hope everyone is still doing well :)

  3. Was wondering if you could provide more details. i.e. Construction that specialize on Steel Frame. Are you recommending steel frame houses. Pricing issue (mas mahal b ang steel frame house compared to traditional construction method) so on and so forth...

     

    SORRY FOR THE LONG ABSENCE..BEIN SLAYING DEMONS LATELY SO TO SPEAK...

     

    MAS MAHAL TALAGA PA STEEL..PERO HINDI NAMN LAHAT KAILANGAN STEEL..KAYA NGA MAY TERM SA CIVIL ENGINEERING NA "COMPOSITE STRUCTURE" MAY HALO NA KAHOY AT BATO (KONKRETO).

     

    MAHAL PERO MAS MATAGAL MASIRA KAYSA SA KAHOY, AT BASTA TREATED AND MADE AS PER STANDARD.

     

    AT MEDYO MAHAL KASI YUNG LABOR NA KASAMA HINDI BASTA KARPENTERO LANG..WELDER TALAGA..

     

     

    MORE QUESTIONS ARE WELCOME!!

  4. ma-hirap ang lagay pala sa ganito...ako kasi as of the moment im threading carefully..baka kasi ako ang mawala sa sarili ko...im still young, very much single and very much unaattached...but im still cuaght in a fix...kasi nagustuhan ko itong g.r.o na nakilala ko...

     

    yes we do those sordid kisses pag nakainum na kami sa ktv, pero yun lang naman...nakakahiya mang aminin kya lang baka mawalan ako ng credibilty dun sa thread na bibuo ko...

     

    advice naman on the danger sides..i need signs so i can bail out pag may problem talaga

  5. ok, in the first place bro, did you ask her who gave her these meds, and why is she taking them..?

     

    the only reason i can deduce from this is that she has something, most likely an STD judging from the meds she is taking...

     

    something tells me that you really like this gal.. and it`s up to you how you can convince her to trust you..

     

    try to tell her that you are concerned for her well-being, and convince her that it`s for her own good that she should consult an OB-GYNE if she has problems down there like you mentioned...

     

     

     

     

    :mtc:

     

    thank you for the headsup...peter & mwah..im not being judgemental..i just want to know...and yes i have to admit i really like this person inspite of the fact that she is really a g.r.o and that she did some "things" before that why she got it...( i was able to get a confession..and yes it does bring the hurt close to home ) anyway now im asking is it possible if i can get her disease via oral contact..intense kissing, french kissing etc. since that is the only initimate activity im able to achieve at the moment...

     

    do i need to see a doctor, what do i do?

     

    thanks for the help

  6. i never thought it would come to this...

     

    please do tell me im wrong...

     

    a friend of mine who works at a bar( we're getting close by the way..but nothing in bed..) told me she's having problems down there and thinks its just uti..she professes that she really doenst "do" people

     

    when i saw the meds, its doxycycline, cefixime, & quedox

     

    now i know what are these are for, but can somebody tell me..is it just a coincidence or its really the real deal...

     

    is it really that she has a) syhiliis , B) gonorrhea c) chlamydia or hopefully its just a bad case of uti.

     

    she profess to be very much of a saint but now i dont know...

     

    pls help.

     

    im trying to convince her to see a doctor, and she's not telling me an ything..

     

    help po

  7. so as it says here..

     

    http://www.newsflash.org/2004/02/hl/hl108264.htm

     

    http://thepeninsulaqatar.com/Display_news....09020383349.xml

     

    IN THIS MESSAGE BOARD..MOST HAVE READ THAT I HAVE BEEN VERY CRITICAL OF THOSE BEING UNDER THE ENGINEERING PROFESSION, AND MIND YOU...I ACTUALLY SPEAK MY MIND WHEN PEOPLE OF MY SAME TRADE EXCHANGE BARBS WITH ME..AND AT TIMES GO OVER THEIR HEAD NOT REALIZING THE ESSENCE OF THIS THREAD...

     

    SO AS THIS SO CALLED PROFESSIONALS ARE TRYING TO SALVAGE THEIR SO-CALLED REPUTATION...LET ME JUST REMIND THE READERS WHAT THEY OUGHT TO REMEMBER.

     

    SO LET ME JUST LOOK AT THE HEADLINE...

     

    World Bank links officials, politicians to road projects scam

    Web posted at: 2/3/2009 8:33:49

    Source ::: Philippine star

     

    Manila: The World Bank (WB) not only indicted seven contractors for allegedly manipulating three biddings for road projects worth $33m it had offered to finance; it also linked politicians and government officials to the manipulation. In its four-page decision on the case of the seven contractors, the WB accused them of engaging in “fraudulent practices,” including “misrepresentation of facts to influence the procurement (bidding) process for one or more procurement packages.” < LIKE WHAT I HAVE NOTED IN MY PAST POSTINGS HERE...BIDS CAN BE EASILY MANIPULATED..THATS WHY THE QUANTITY SURVEYOR IS NOT SUPPOSE TO BE THE ESTIMATOR TOO. >

     

    “In addition, they include participation in a collusive scheme, also involving politicians and government officials, whereby awards were directed to particular contractors in exchange for bribes, kickbacks and payments to designated losing bidders,” the WB said. Three of the seven contractors are Filipino companies, while four are Chinese firms. < NOTHING WRONG WITH THIS ONE..KAYA LANG SABIT TALAGA YUNG PINOY..HEHE!!! >

     

    The Filipino contractors are E. C de Luna Construction Corp, owned by Eduardo de Luna, which the World Bank blacklisted permanently; and Cavite Ideal International Construction and Development Corp and CM Pancho Construction, Inc, which were each barred from participating in WB projects for four years. < AS FAR AS I HAVE HEARD..ONE OF THIS FIRMS WAS ACTUALLY CAUGHT IN A RAID BY BSA - BUSINESS SOFTWARE ALLIANCE, FOR USING PIRATED COPIES OF AUTODESK..IM JUST NOT SURE WHO...BUT ANYWAY..AS YOU CAN SEE...THEY HAVE HUGE PROFITS AND YET THEY CAN'T AFFORD TO USE THE SOFTWARE...IM NOT BEING A HYPOCRITE HERE..BUT THE BOTTOMLINE IS THAT THIS SO CALLED TRIPLE A COMPANIES SHOULD TOW THE LINE IN TERMS OF SHOWCASING TO THE WORLD OF THEIR CREDENTIALS...IT IS A SHAME REALLY..AND I HOPE THE DEPT. OF LABOR IS LOOKING INTO THEM IN CASE THEY MIGHT BE LABOR VIOLATORS TOO.. >

     

    The Chinese contractors are China Geo-Engineering Corp, China Road and Bridge Corp, China State Construction Engineering Corp, and China Wuyi Co Ltd. Unlike construction firms participating in biddings for its projects which it can identify and sanction, the WB did not name the politicians and government officials it linked to bid manipulation and who it said were taking bribes and kickbacks.

     

    The officials are presumably from the Department of Public Works and Highways (DPWH), the agency implementing WB-financed projects that conducted the three failed biddings for the $33m worth of roads between 2002 and 2006.

    < OF COURSE..THE USUAL SUSPECT..ITS A FACT THAT ITS THE DPWH THAT HANDLES IT..BUT MIND YOU, NOT EVERYONE HAS A DIRTY NOSE...I KNOW OF RESPECTABLE PEOPLE THERE TOO WHO ARE ACTUALLY REAL PROFESSIONALS IN THEIR OWN RIGHT >

     

    The WB withdrew its funding offer after discovering evidence of bid manipulation. During the second hearing of the House committee on public works on the blacklisting of the seven contractors last Wednesday, Nueva Vizcaya Representative Carlos Padilla suggested that the Philippine government should ask the World Bank for the names of politicians and government officials and its evidence against them. < IS THERE REALLY SOMETHING THAT WE CAN DO..IF THE ONE WITH THE MONEY GETS IT BACK BECAUSE IT KNOWS THE MONEY IS NOT BEING USED WISELY..SIGE NGA..SINONG MATINONG TAO ANG MAGPAPAUTANG KUNG ALAM NIYANG DI NMAN GAGAMITIN NG MAAYOS YUNG PERA >

     

    “We should be interested in finding out who these people are. In fact, we must prosecute them,” he said. Padilla said it is reports about corruption from international agencies like the WB that give the Philippines the reputation as one of the most corrupt countries in the world. < TAKE NOTE..EVEN AMNESTY INTERNATIONAL SAYS SO.. >

     

    Less than two hours after Padilla made the appeal, the hearing panel chaired by Leyte Representative Roger Mercado cleared the seven blacklisted contractors. < OH WHAT THE HELL HAPPENED..CLEARED ALREADY? >

     

    Mercado said his committee found no evidence that the contractors were engaged in fraudulent and collusive practices as the WB had accused them of doing. Over the weekend, Senator Aquilino Pimentel Jr said a WB official in Washington D C has told him that they are willing to furnish the government the evidence they have against the contractors. < SO THIS PERSON THINKS THERE IS NO EVIDENCE TO POINT OR PIN ON THE CONTRACTORS...TAKE NOTE THAT "CONNIVANCE" OR IN FILIPINO "PAKIKIPAGSABWATAN" WAS THE REASON THE WB HAS CORRUPTION ON ITS REPORT..SO HOW CAN YOU PROVE IT IF THE PAPER TRAIL ITSELF IS CONTAMINATED...SO THATS WHY THIS PARTICULAR PROVINCE IS HAVING LANDSLIDE PROBLEMS...MAHIRAP MAGABSUWELTO NG GANUN LANG AH..TAPOS GANUN LANG YON...KULANG SA RESEARCH..DAPAT ITO MAG-COLLEGE MUNA ULIT...BUTI PA YUNG ISA..NAGHINTAY MUNA NG PAPEL BAGO MAG-DESISYON...HINDI SAYNG ANG BOTO KO SA YO SIR!! >

     

    “According to him, we can have access to all these pieces of evidence for the purpose of prosecution. At this point, I cannot elaborate, but there is an ongoing process for the World Bank to provide our country with solid and concrete evidence enough for prosecution,” Pimentel said. < HINDI NGA SAYANG ANG BOTO KO SA YO SIR >

     

    The contractors claimed that the bank punished them without giving them a fair hearing. The WB, however, insisted that it followed due process in deciding to blacklist the seven companies. < ONLY IN THE PHILIPPINES...THE ONE ASKING FOR THE LOAN IS THE ONE COMPLAINING TO THE ONE WHO WILL GIVE THE LOAN...KUNG DITO YAN SA SIMPLENG LENGGUA FRANCA..SA TINDAHAN KUNG AYAW MO..WAG MO..WALANG UTANG!! >

     

    In 2006, after the three failed biddings for the WB-financed road projects, President Arroyo approved the recommendation of DPWH Secretary Hermogenes Ebdane for his department to take over the projects and to pursue them using its own funds. In the succeeding biddings, E C De Luna Construction, one of the seven WB-blacklisted firms, won a 100m pesos contract for a road in the Negros provinces. < CAN SOMEBODY TELL US WHAT HAPPENED TO THIS SO CALLED PROJECT IN NEGROS? >

     

    SO MANY POSSIBLE CONTRACTORS..HOW COME WE CAN'T GET ANY GOOD ONES?

     

    YOU'RE GUESS IS AS GOOD AS MINE.

  8. bro, what i couldn't wait for was your follow-up. did end your 2nd to last post with "more on this to follow". he, he. i guess you misundertood me.

     

    selling the lot would be easy. when i hinted that i was thinking of selling it to the village office, they gave my contact number to both real estate brokers and private individuals alike who have called me regularly inquiring about the lot "for sale."

     

    however, given that i am semi-retired, i am looking for ways to earn extra. that's why i thought of building a house and sell it hoping to make more than i would just selling the land by itself. and that's why i initially wanted to know what was the mark-up on houses and lots (e.g. is it 20% of the construction cost + land)- to see if it is feasible for me to dip my hands in such an endeavor.

     

    hope you can still help. :)

     

     

    GREETINGS!!

     

    THE BOSS IS BACK...

     

    CURRENTLY ENJOYING THE WEATHER UP HERE IN PAMPANGA..AT CLARK...OVERSEEING SOME PORTIONS OF THE TEXAS

    INSTRUMENTS PROJECT HERE...CANNOT COMMENT MUCH ON THE CONDITION..ITS CONFIDENTIAL.

     

    ANYWAY...

     

    Q: however, given that i am semi-retired, i am looking for ways to earn extra. that's why i thought of building a house and sell it hoping to make more than i would just selling the land by itself. and that's why i initially wanted to know what was the mark-up on houses and lots (e.g. is it 20% of the construction cost + land)- to see if it is feasible for me to dip my hands in such an endeavor.

     

    A: madalas kasi depende kung saan yung lupa mo..pwede mong ibenta ng base sa benta kada squaremeter nung mga katabi mo...halimbawa kung malapit ka sa highway..pwede mong ibenta ng mga 20T / sqm tapos mula dun..mag presyo ka ng pagpagwa mo..halimbawa..12T / sqm para sa structure...di kung gano kalaki yung structure mo..say..40sqm tapos up & down eh di 80sqm na yon..multiply mo sa 12T tapos idagdag mo yung presyo ng lupa..yun ang suma..pag-ibebenta mo patungan mo na lang ng 10% kasi dun sa naunang figure may patong pa yon..pag may nag negotiate dun mo na subukan kung pwede pang babaan.

  9. MGA TANONG NA PANG-SUBDIVISION ULIT...

     

    PARA MAS LALONG MAINTINDIHAN...

     

    Q) Sino ang maaaring magtatag ng Homeowners’ Association?

    A) Ang maaaring magtatag ng asosasyon ay mga nakatira sa subdivision na wala pang asosasyon at mga taong nais magakaroon ng bahay at lupa sa ilalim ng mga programang pabahay ng pamahalaan.

     

    Q) Saan nagpapaparehistro ng Homeowners’ Association?

    A) Ang asosasyon ay ipinarerehistro sa regional office ng HLURB na nakakasakop sa subdivision o lupang nais bilhin ng asosasyon.

     

    Q) Ilan dapat ang bilang ng incorporators?

    A) Ang bilang ng incorporators ay hindi dapat bababa sa lima at hindi hihigit sa labinglima.

     

    Q) Ilan dapat ang bilang ng directors?

    A) Ang bilang ng directors ay hindi dapat bababa sa lima at hindi hihigit sa labinglima.

     

    Q) Ilan dapat ang bilang ng mga kasapi ng isang asosasyon?

    A) Sa mga asososyon sa subdivision, walang limitasyon ang dami ng miyembro. Sa mga asosasyon ng mga mangungutang sa CMP, ang bilang ng miyembro ay hindi dapat lalampas sa tatlong daan.

     

    Q) Bakit inirerehistro ang isang asosasyon?

    A) Inirerehistro ang isang asosasyon upang ito ay magkaroon ng juridical personality na iba sa mga opisyales at kasapi nito.

     

    Q) Ilan dapat ang bilang ng directors o trustee?

    A) Ang bilang ng directors o trustees ay hindi dapat bababa sa lima at hindi hihigit sa labinglima katao.

     

    Q) Sapilitan ba ang pagpapatala ng isang asosasyon?

    A) Sa mga subdivision, ang pagpapatala ng asosasyon ay hindi sapilitan ngunit sa mga nais mapasailalim ng CMP, ito ay kailangan dahil hindi sila pauutangin kung hindi sila rehistrado.

     

    Q) Ano ba ang alituntunin tungkol sa pangalan ng asosasyon?

    A) Ang pangalan ng isang asosasyon ay hindi dapat kasingtulad, kasing tunog o kasing hawig ng isang asosasyon na nakatala o nakarehistro na. Ito ay para maiwasan ang pagkalito ng mga tao kung aling asosasyon ang kanilang kaharap o kausap.

     

    Q) Ano ang nilalaman ng Articles of Incorporation?

    A) Ang nilalaman ng Articles of Incorporation ay ang mga sumusunod:

     

    Pangalan ng asosasyon

    Pakay ng pagtatag ng asosasyon

    Lugar ng opisina ng asosasyon na dapat ay nasa Pilipinas

    Tagal ng buhay ng asosasyon

    Mga pangalan, nationalities at tirahan ng mga incorporators

    Bilang ng mga directors o trustees

    Bilang ng kapital, ng mga pangalan, nationalities at tirahan ng mga nag-ambag at kung magkano ang inambag ng bawa’t isa

    Iba pang mga bagay na hindi labag sa batas na mahalaga sa pagkakaalam ng mga incorporators

     

    Q) Ano ang mga dapat na nilalaman ng By-Laws?

    A) Ang mga dapat na nakasaad sa By-Laws ay ang mga sumusunod:

     

    Lugar, oras at paraan ng pagtawag at pagdaos ng pulong ng mga directors o trustees

    Lugar, oras at paraan ng pagtawag at pagdaos ng pangkalahatang pulong

    Kinakailangang dami o bilang ng dadalo sa mga pulong at halalan

    Paraan ng proxies at paraan ng pagboto ng proxy

    Qualifications at disqualifications, tungkulin at pabuya sa mga directors o trustees

    Araw ng halalan at paraan ng pagbigay ng paalala o pagtawag ng halalan

    Paraan ng paghalal o pagtalaga at tagal ng panunungkulan ng mga director o trustees at mga opisyales

    Mga parusa sa paglabag ng mga alituntunin o By-Laws

    Mga bagay na mahalaga at kanais-nais para sa asosasyon

     

    Q) Ano ba ang mga kapangyarihan o maaaring gawin ng isang asosasyon?

    A) Ang mga maaaring gawin ng isang asosasyon ay ang mga sumusunod:

     

    Maghabla at ihabla sa ilalim ng pangalan ng asosasyon

    Ang magmana sa ilalim ng pangalan ng asosasyon habang ito ay hindi pa nabubuwag

    Gumamit ng selyo ng isang korporasyon o asosasyon

    Pagsusog ng Articles of Incorporation ayon sa Batas Pambansa Bilang 68

    Paggawa ng By-Laws na hindi taliwas sa batas, kagandahang asal, polisiya ng publiko at ang pagsususog nito

    Tumanggap, bumili, mamigay, umupa, o humawak ng ari-arian ng sang ayon sa batas

    Makipag-isa o sumapi sa ibang asosasyon upang makabuo ng isang asosasyon

    Mamigay ng mga ari-arian ng asosasyon

    Tumanggap ng mga kasapi

    Gawing ang mga bagay na ikakatupad ng hangaring ng asosasyon na nakasaad sa Articles of Incorporation na hindi labag sa batas

     

    Q) Ano ang hindi maaaring gawin ng isang asosasyon?

    A) Ang isang asosasyon ay hindi maaaring magkaroon o gumawa ng anumang karapatan maliban sa mga ibinibigay dito ng batas at ng Articles of Incorporation at mga kaakibat ng mga kapangyarihang sasabi.

     

    Q) Gaano katagal ang buhay ng isang asosasyon?

    A) Ang asosasyon ay maaaring tumagal ng limampung taon, maliban na lang kung ito ay bibigyan pa ng karagdagang panahon o babawasan sa pamamagitan ng pagsusog ng Articles of Incorporation o pagdissolve o pagbuwag nito ng mga opisyales at kasapi nito o ng pamahalaan/HLURB.

     

    Q) Kailan nagsisimula ang buhay ng isang asosasyon?

    A) Ang asosasyon ay nagkakaroon ng buhay mula sa araw na ito ay mabigyan ng Certificate of Registration.

     

    Q) Sino ang nag-aapruba ng mga amiyenda sa Articles of Incorporation at By-Laws?

    A) Ang majority ng board of directors o trustees ang unang nag-aapruba ng anumang amiyenda sa mga provisions ng Articles of Incorporation at By-Laws at pinagtitibay ito sa pamamagitan ng isang Board Resolution. Pagkatapos, ito ay ipapaapruba sa two-thirds o majority ng mga miyembro ng asosasyon.

     

    Q) Kailan nagkakabisa ang mga inamiyendahan sa Articles of Incorporation at By-Laws?

    A) Ang Amended Articles of Incorporation at By-Laws ay nagkakabisa sa araw na ito ay maaprubahan ng HLURB at mabigyan ng Certificate of Filing of Amended Articles of Incorporation and By-Laws kapag naisumite lahat ng requirements ng opisina at ang mga amendments ay di labag sa batas.

     

    Q) Ano ang obligasyon ng asosasyon sa HLURB pagkatapos na ito ay mairehistro?

    A) Ang asosasyon ay dapat magsumite sa HLURB ng reportorial requirements ukol sa resulta ng eleksyon ng mga directors at officers at estadong pinansyal ng asosasyon kada taon, depende sa termino ng mga opisyales. Dapat ding patatakan ang mga libro ng asosasyon sa HLURB.

     

    Q) Ano ang epekto kapag ang isang asososasyon ay hindi nakarehistro?

    A) Kapag ang isang asosasyon ay hindi nakarehistro at ginagampanan at nag-ooperate sya na gamit ang karapatan at pribilehiyo ng isang rehistradong asosasyon, ang mga opisyales at miyembro nito ang personal na mananagot sa mga obligasyon at mga paglabag sa batas ng nasabing de facto association.

     

     

    KUNG MERON PA KAYONG MGA TANONG..PAKI POSTE NA LAMANG SA PITAK NA ITO :headsetsmiley:

  10. MGA TANONG NA PANG-SUBDIVISION:

     

    Q) What is a subdivision project?

     

    A) Subdivision project refers to a parcel of land registered under Act No. 496 which is partitioned into individual lots for residential, commercial, industrial or other purposes with or without improvements thereon, and offered for sale to the public.

     

    Q) What is a condominium project?

     

    A) Condominium project refers to the entire parcel of real property divided or to be divided into condominium units for residential, commercial, industrial or other purposes, including the structure thereon.

     

    Q) Can a chapel be constructed in open space reserved for parks and playgrounds?

     

    A) No. Open space reserved for parks and playground is non-buildable and chapel as well as other subdivision’s facilities may only be constructed in open space not reserved for parks and playground. < AS YOU CAN SEE IT IS THE HOMEOWNERS ASSOCIATION THAT AT TIMES DECIDE ON THIS >

     

    Q) Can a Developer sell the subdivision’s open space?

     

    A) No because subdivision’s open space is beyond the commerce of man.

     

    Q) Can an owner/developer of a subdivision project impose a height limitation on the house to be constructed therein?

     

    A) Yes, in order to preserve the style and uniformity of project but height limitation should not be contrary to the approved zoning ordinance the same will be deemed inoperative. < IF YOU CAN REMEMBER IF YOU BACKREAD..THIS IS PART OF THE RESTRICTIVE CONTRACT THAT YOU SIGN WHEN YOU BUY THE PROEPRTY..PLS READ YOUR DOCUMENTS BEFORE HAND SO YOU WILL KNOW >

     

    KEEP THOSE QUESTIONS COMING :thumbsupsmiley:

  11. SORRY BUT ITS BEEN QUITE A WHILE INDEED :sleepysmiley03:

     

    I HAD NOTED THAT SOME USUALLY HAVE QUESTIONS REGARDING SIZE AND THE RATIONALE BEHIND THE PD 927 &

    BP220..SO LET MJE SOME QUOTE SOME BASICS :

     

    Q )What are the latest minimum design standards ?

     

    A )Under BP 220

     

    Minimum lot area

     

    Single Detached - 72 sqm for economic housing; 64 sqm for socialized housing

    Duplex/Single Attached - 54 sqm for economic housing; 48 sqm for socialized housing

    Rowhouse - 36 sqm for economic housing; 32 sqm for socialized housing

     

    Minimum floor area

     

    22 sqm for economic housing; 18 sqm for socialized housing

     

     

    Under PD 957

     

    Minimum lot area

     

    Single Detached - 120 sqm for open market housing; 100 sqm for medium cost housing

    Duplex/Single Attached - 96 sqm for open market housing; 80 sqm for medium cost housing

    Rowhouse - 60 sqm for open market housing; 50 sqm for medium cost housing

     

    Minimum floor area

     

    42 sqm for open market housing; 30 sqm for medium cost housing

     

     

    Q ) What are the latest price ceilings?

    A ) The current price ceilings as set by the Housing and Urban Development Coordinating Council (HUDCC) are the following:

     

    Socialized housing = PHP 300,000.00 and below;

    Low Cost

    - Level 1 = above PHP 300,000.00 to PHP 1,250, 000.00 (BP 220 standard);

    - Level 2 = above PHP 1,250,000.00 to PHP 2,000,000.00 (PD 957 standard);

    Medium cost = PHP 2,000,000.00 up to PHP 4,000,000.00;

    Open Housing = above PHP 4,000,000.00

     

    Q) Are the revised IRRs for PD 957 and BP 220 already in effect?

    The revised IRRs which were approved per Board Resolutions No. 699 and 700, Series of 2001 took effect last 06 May 2002. Amendments approved per Board Resolution No. 725, Series of 2002 took effect on 26 July 2002.

     

    Q) How do we get copies of the new IRRs for PD 957 and BP 220?

    A) Copies of the IRRs for PD 957 and BP 220 are available at the Rules and Standards Development Group, 2nd Floor of the HLURB Central Office, Kalayaan Avenue, Diliman, Quezon city. Requesting parties are charged P200 per copy to cover cost of printing.

     

    Q) Where can 20% compliance to balanced housing requirement be located?

    A) The 20% socialized housing requirement can be located within the same city or municipality as the main project. In cases where this is not feasible, the compliance project may be located in any city or municipality within the same region or in any city or municipality within the regions adjacent to it.

     

     

    KEEP THOSE QUESTIONS COMING FOLKS !!!

  12. i need H E L P !!!!

     

    i think i got a virus...it installs all those ""folder.exe"" in my flash disk and hard drive and then at my strt-up theres this ""setup.exe"" file and worst of all

    it does not allow me access to regedit, task manager and installing anything related to avg antivirus pati yung website sinasara ng virus..its like a programmed denial of service...

     

    i have read online that avg has posted that it is actually a virus...

     

    help lang po!!!

  13. QUESTIONS CONCERNING HLURB TERMINOLOGY

     

    What is a subdivision project?

     

    Subdivision project refers to a parcel of land registered under Act No. 496 which is partitioned into individual lots for

    residential, commercial, industrial or other purposes with or without improvements thereon, and offered for sale to the public.

     

    What is a condominium project?

     

    Condominium project refers to the entire parcel of real property divided or to be divided into condominium units

    for residential, commercial, industrial or other purposes, including the structure thereon.

     

    Can a chapel be constructed in open space reserved for parks and playgrounds?

     

    No. Open space reserved for parks and playground is non-buildable and chapel as well as other subdivision’s facilities

    may only be constructed in open space not reserved for parks and playground.

     

    Can a Developer sell the subdivision’s open space?

     

    No because subdivision’s open space is beyond the commerce of man.

     

    Can an owner/developer of a subdivision project impose a height limitation on the house to be constructed therein?

     

    Yes, in order to preserve the style and uniformity of project but height limitation should not be contrary to the

    approved zoning ordinance the same will be deemed inoperative.

  14. SORRY FOR THE LATE REPLY TO THOSE READING THIS THREAD.. ITS JUST THAT I HAVE QUITE BUSY THIS PAST FEW MONTHS

    AS MOST OF US KNOW THAT DURING THIS TIME IN PARTICULAR..WHEN THE CALENDAR YEAR ENDS, AND SOON AFTER THE FISCAL CALENDAR

    ENDS AND WILL SOON BEGIN..HOT MONEY FLOWS QUITE LIBERALLY ( SEE BUSINESS SECTION OF THE DAILIES )

     

    AS PER ADVISE..THOSE ASKING CERTAIN QUESTIONS CONCERNING THE IMPLEMENTING POWERS OF THE HLURB

    SUCH AS THAT FOR BP 220 & PD 957

     

     

    1.What are the latest minimum design standards ?

     

    Under BP 220

     

    Minimum lot area

     

    Single Detached - 72 sqm for economic housing;

    64 sqm for socialized housing

     

    Duplex/Single Attached - 54 sqm for economic housing;

    48 sqm for socialized housing

     

    Rowhouse - 36 sqm for economic housing;

    32 sqm for socialized housing

     

    Minimum floor area

     

    22 sqm for economic housing; 18 sqm for socialized housing

     

     

    Under PD 957

     

    Minimum lot area

     

    Single Detached - 120 sqm for open market housing;

    100 sqm for medium cost housing

     

    Duplex/Single Attached - 96 sqm for open market housing;

    80 sqm for medium cost housing

     

    Rowhouse - 60 sqm for open market housing;

    50 sqm for medium cost housing

     

    Minimum floor area

     

    42 sqm for open market housing;

    30 sqm for medium cost housing

     

     

    What are the latest price ceilings?

    The current price ceilings as set by the Housing and Urban Development Coordinating Council (HUDCC) are the following:

     

    Socialized housing = PHP 300,000.00 and below;

     

    Low Cost

    - Level 1 = above PHP 300,000.00 to PHP 1,250, 000.00 (BP 220 standard);

    - Level 2 = above PHP 1,250,000.00 to PHP 2,000,000.00 (PD 957 standard);

    Medium cost = PHP 2,000,000.00 up to PHP 4,000,000.00;

    Open Housing = above PHP 4,000,000.00

     

    Are the revised IRRs for PD 957 and BP 220 already in effect?

     

    The revised IRRs which were approved per Board Resolutions No. 699 and 700, Series of 2001 took effect last 06 May 2002.

    Amendments approved per Board Resolution No. 725, Series of 2002 took effect on 26 July 2002.

     

    How do we get copies of the new IRRs for PD 957 and BP 220?

     

    Copies of the IRRs for PD 957 and BP 220 are available at the Rules and Standards Development Group, 2nd Floor of the HLURB Central Office, Kalayaan Avenue, Diliman, Quezon city. Requesting parties are charged P200 per copy to cover cost of printing.

     

    Where can 20% compliance to balanced housing requirement be located?

     

    The 20% socialized housing requirement can be located within the same city or municipality as the main project. In cases where this is not feasible,

    the compliance project may be located in any city or municipality within the same region or in any city or municipality within the regions adjacent to it.

     

     

    JUST KEEP ON POSTING EM QUESTIONS !!! :thumbsupsmiley:

  15. I WOULD JUST LIKE TO COMMENT ON THE RECENT BROUHAHA FOR THE CE BOARD EXAMS

     

     

    UNLIKE THE OTHERS WHO AGREE THAT THERE SHOULD BE A RETAKE, MY TAKE ON THE ISSUE IS THAT I BELIEVE THEY SHOULD

    HAVE JUST AGREED ON THE THE TERMS AS GIVEN BY THE REGULATION COMMISION...THE MORE NOISE THEY MAKE.. THE MORE ISSUES

    AND PROBLEMS THAT THEY WILL CREATE.

     

    AND I HOPE I HAVE MY SOURCES RIGHT..BUT IS SEEMS THAT 400+ EXAMINEES GOT TESTS 2 & 3 FLUIDS/ HYDRAULICS & FOUNDATION & STRUCTURAL ENGR. RESPECTIVELY ) GOT A PERFECT SCORE...WHICH IS WELL..I REALLY FIND STATISTICALLY IMPROBABLE TO SAY THE LEAST.

     

    WELL...I SUPPOSE IF YOU GET CAUGHT YOU JUST HAVE TO FACE THE MUSIC...AND BESIDES..

     

    TITLES WILL NOT MAKE YOU WHAT YOU ARE..IT IS THE ACTIONS THAT YOU DO

  16. Sir 'NASTYMERLIN27'

     

    I need your advise.

    I had fully paid my townhouse unit in Imus Cavite but not paid yet required taxes (VAT, real estate, etc.). Is it possible to make it as collateral for another unit?

    Your reply is most appreciated.

    Thanks & God bless!

     

    IN RELATION TO CIRRUS2007'S QUERIES

     

    1. I had fully paid my townhouse unit in Imus Cavite but not paid yet required taxes (VAT, real estate, etc.). Is it possible to make it as collateral for another unit?

     

    < I SUPPOSE THAT IS POSSIBLE..BUT YOU HAVE TO CHECK FIRST WITH THE BANK OR WHATEVER INSTITITION YOUR APPLYING FOR AS YOUR COLLATERAL USUALLY THEY ARE THE ONE CALLING THE SHOTS THRU THEIR REQUIREMENTS. >

  17. Thanks for the reply sir.

     

    15T per square meter does that include the materials or is it for labor only?

    I will do a computation based on what you have told me sir.

     

     

    IN RELATION TO PEDROPENDUKO'S QUERIES

     

    1. 15T per square meter does that include the materials or is it for labor only?

    < YEP ITS ALL INCLUDED THERE..BUT MIND YOU THIS IS ONLY A PARAMETRIC ESTIMATE - MEANING IT HAS A + / - OF AT LEAST 15% AND

    15T / SQM IS ACTUALLY A BIT BARE...BETTER DO MORE CHECKING AROUND >

     

    COMMENTS ARE WELCOME!!!

  18. Sir Nastymerlin27

     

    I just want to ask like for how much would it cost to build a house that is 10m X 4M, consisting of 3 floors, floor to ceiling height is 3m, the roof will be made of concrete as well as it will serve as a terrace.

     

    Ground floor will be a 2 bedroom, 2 toilet and 1 shower ( will be used for bed spacing)

    2nd floor will be the living room and dining room and 1 Toilet and Bath (for family use)

    3rd floor will be the bedrooms, 1 master's bedroom and then 2 bedroom (for family use)

    Roof Deck with a 1m concrete fence around, may have to install a beam of 2.3m high (other purpose in the future, possible lagyan ng duyan or anything)

     

    Location will be in las pinas, almanza 1 just before the entrance of pilar village. There was a house construction going on near my place, but the foreman says that he will give the estimate if the house is about to be constructed, he does not want to give estimation of the cost for the house because if he won't be the one to build it its going to be a waste of time for him (what a reason).

     

    I am planning to get a loan from Pag-Ibig for this house that I plan to build, I hope that I can get an answer and a rough estimation just to have an idea of how much I will ask for my loan. And please do include the expenses for getting a building permit, hiring an electrician and others.

     

    Thanks much.

     

    IN RELATION TO PEDROPENDUKU'S QUERIES:

     

    1. There was a house construction going on near my place, but the foreman says that he will give the estimate if the house is about to be constructed, he does not want to give estimation of the cost for the house because if he won't be the one to build it its going to be a waste of time for him (what a reason).

    < WELL I GUESS HIS REASON IS UNDERSTANDABLE...ITS NOT EASY HAVING TO DRAW A PLAN AND ESTIMATE THE ITEMS INVOLVED...I SUGGEST YOU GIVE HIM SOMESORT OF "CARROT STICK" SO HE'D BE ABLE TO GIVE YOU WHAT U NEED..OR I SUGGEST JUST DO A PARAMETRIC ESTIMATE..USE A FACTOR OF SAY 15T PER SQM..I GUESS THAT WOULD BE A SAFE ESTIMATE >

     

    2.I am planning to get a loan from Pag-Ibig for this house that I plan to build, I hope that I can get an answer and a rough estimation just to have an idea of how much I will ask for my loan. And please do include the expenses for getting a building permit, hiring an electrician and others.

     

    < DONT WORRY THEY WILL ASK YOU FOR A SET OF PLANS FOR THE CONSTRUCTION AND THEY WILL APPRAISE IT BASED ON THEIR ESTIMATES..I SUGGEST MAKE TO SETS..SUBMIT TO PAG-IBIG THE ONE WHICH IS ..WELL EXPENSIVE, THEN USE THE OTHER LOW COST FOR ACTUAL CONSTRUCTION...DON'T GET CAUGHT THOUGH..YOUR LOAN MIGHT BE IN TROUBLE...BUILDING PERMIT HAS FIXED FEES..PLS REFER TO YOUR LOCAL GOVERNMENT FOR THEIR SCHEDULE AND IT DEPENDS TOO ON HOW MUCH IT WILL COST...HIRING AN ELECRICIAN..SCOUT AROUND ..LOTS OF EM DONT HAVE WORK..MOST LIKELY IF YOU ASK THE BUILDING OFFICIAL HE CAN HAVE SOMOENE DO IT FOR A FEE..

     

    REPLIES A ENCOURAGED!! :thumbsupsmiley:

×
×